Metadata
| Status | done |
|---|---|
| Assigned | agent-809 |
| Agent identity | 3577bc75d6ed4f1947509aa5c086c91ce7c997c7806dab6bf6affac647452647 |
| Created | 2026-05-06T00:34:52.320206025+00:00 |
| Started | 2026-05-06T00:58:03.849148747+00:00 |
| Completed | 2026-05-06T01:07:07.423078610+00:00 |
| Tags | bog-this-week, synthesizer, eval-scheduled |
| Eval score | 0.89 |
| └ blocking impact | 0.90 |
| └ completeness | 0.90 |
| └ constraint fidelity | 0.25 |
| └ coordination overhead | 0.88 |
| └ correctness | 0.92 |
| └ downstream usability | 0.85 |
| └ efficiency | 0.85 |
| └ intent fidelity | 0.92 |
| └ style adherence | 0.88 |
Description
Integrate the 15 slide files produced by the fanout into a coherent slide plan.
INPUTS: slides/v2/slide_*.md (15 files). Plus paper_prep/synthesis/ABSTRACT.md (anchor) and paper_prep/synthesis/CROSSWALK.md (substrate).
DELIVERABLES (under slides/v2/):
- SLIDES_v2_PLAN.md — consolidated plan with: (a) per-slide section copying through each slide_NN_.md content under one heading per slide, (b) Narrative arc section (talk story flow with transition sentences), (c) Time budget validation summing per-slide times and confirming total ≤ 900s ideally; flag overruns, (d) Open questions for Erik aggregating any "Notes for synthesizer" from the 15 inputs, (e) Risks and decisions for things needing the lead author's call.
- figure_manifest.md — table: every figure referenced across the 15 slides with source path, exists Y/N, generation status, slides using it.
- coherence_check.md — flags inconsistencies between adjacent slides, narrative gaps, callbacks that don't land.
ACCEPTANCE: all three files; per-slide times summed and reported (target ≤ 900s, flag if >); single commit "docs: synthesize BoG v2 slide plan from per-slide fanout"; wg artifact records all three.
DO NOT modify slide_NN files (read-only). DO NOT build a deck (.pptx, .key, beamer, typst). DO NOT generate new figures. DO NOT touch files outside slides/v2/.
Depends on
- done
bog-v2-slide-01 - done
bog-v2-slide-02 - done
bog-v2-slide-03 - done
bog-v2-slide-04 - done
bog-v2-slide-05 - done
bog-v2-slide-06 - done
bog-v2-slide-07 - done
bog-v2-slide-08 - done
bog-v2-slide-09 - done
bog-v2-slide-10 - done
bog-v2-slide-11 - done
bog-v2-slide-12 - done
bog-v2-slide-13 - done
bog-v2-slide-14 - done
bog-v2-slide-15 - done
.assign-bog-v2-slides
Required by
Log
- 2026-05-06T00:34:52.296426160+00:00 Task paused
- 2026-05-06T00:34:58.179195421+00:00 Task published
- 2026-05-06T00:35:17.251745323+00:00 Lightweight assignment: agent=random-agent-3577bc75 (3577bc75), exec_mode=full, context_scope=graph, reason=Documenter agent is ideal for synthesizing 15 slide files into coherent documentation (plan, manifest, coherence check); its verify-against-code tradeoff ensures figure validation and narrative consistency checking.
- 2026-05-06T00:58:03.849152564+00:00 Spawned by coordinator --executor claude --model opus
- 2026-05-06T00:58:17.253682826+00:00 Starting synthesis: read 15 slide files + ABSTRACT/CROSSWALK anchors, then write SLIDES_v2_PLAN, figure_manifest, coherence_check
- 2026-05-06T01:06:46.213742879+00:00 Wrote 3 deliverables: SLIDES_v2_PLAN.md (1453 lines, embeds all 15 slide files verbatim under per-slide headings), figure_manifest.md (83 lines, every figure with exists Y/N + status), coherence_check.md (179 lines, 11 inconsistencies flagged: 1 blocker (v1 deck PDF missing), 4 material (slide-06 'six clades' wording, PCA-vs-MDS labels, missing-introvert count S_all=7 vs introvert=6, slide-15 Hi-C numbers vs slide-10), 6 polish)
- 2026-05-06T01:06:46.308933164+00:00 Time budget computed: 30+50+80+70+60+50+80+70+80+80+60+60+90+50+70 = 980s (target ≤900s). Overrun = 80s. Triage path: drop slide 14 (50s) + soft-cut slide 13 CEPH1463 (~20s) + brisk slide 03 (~5s) → 905s ≈ 15:05.
- 2026-05-06T01:06:56.174969323+00:00 Validated: all 3 deliverables present in slides/v2/; per-slide times summed to 980s (over by 80s, triage documented in §1); SLIDES_v2_PLAN.md has all 5 required sections (per-slide content, narrative arc, time budget validation, open questions for Erik, risks/decisions); figure_manifest.md has every figure with exists Y/N + generation status; coherence_check.md flags 11 inconsistencies; v1 deck PDF (slides/20260204_Subtelomics_overview_EG.pdf) confirmed missing — flagged as Blocker; slide_NN files unmodified (read-only per task spec); only 3 new files in slides/v2/; no files outside slides/v2/ touched.
- 2026-05-06T01:07:01.680200771+00:00 Committed: fa8d410 — pushed to origin/wg/agent-809/bog-v2-slides
- 2026-05-06T01:07:07.423082577+00:00 Task pending eval (agent reported done; awaiting `.evaluate-*` to score)
- 2026-05-06T01:08:42.556314158+00:00 PendingEval → Done (evaluator passed; downstream unblocks)