Metadata
| Status | done |
|---|---|
| Assigned | agent-201 |
| Agent identity | 3184716484e6f0ea08bb13539daf07686ee79d440505f1fdf2de0357707034c3 |
| Created | 2026-05-01T23:26:58.859060772+00:00 |
| Started | 2026-05-02T00:10:46.055886645+00:00 |
| Completed | 2026-05-02T00:25:03.651615172+00:00 |
| Tags | grant,urgent,v3,assemble, eval-scheduled |
| Eval score | 0.73 |
| └ blocking impact | 0.70 |
| └ completeness | 0.75 |
| └ constraint fidelity | 0.70 |
| └ coordination overhead | 0.70 |
| └ correctness | 0.70 |
| └ downstream usability | 0.65 |
| └ efficiency | 0.75 |
| └ intent fidelity | 0.89 |
| └ style adherence | 0.90 |
Description
Description
The 12 per-criticism fix tasks have produced structured fix specs in ~/poietic.life/notes/v3-fixes/fix-*.md. This task applies them deterministically to v3 to produce v3.1.
What to read
- ALL fix specs in
~/poietic.life/notes/v3-fixes/:- fix-m1.md, fix-m2.md
- fix-h1.md through fix-h7.md
- fix-w1.md (the big one — likely multi-section)
- fix-divergent-29.md (two options — pick the 'keep-honest' version unless its rationale is weak)
- fix-optional-bundle.md (apply ALL polish items)
workgraph_google_application_FINAL_v3.mdat commit70c8e7fon worktreewg/agent-77/v3-assemble-stitch. Usegit show 70c8e7f:workgraph_google_application_FINAL_v3.md.~/poietic.life/notes/v3-review-synthesis-20260501.md(for context if a fix spec is ambiguous)- CLAUDE.md word limits
What to do
- Construct
workgraph_google_application_FINAL_v3_1.mdat project root from v3 + fix specs. - Apply each fix spec's before→after replacement. If two specs touch the same section, integrate them carefully (likely fix-w1 + a smaller H/O fix in the same section — fix-w1 takes priority on structural changes; smaller fixes apply on top).
- Recount EVERY section's word count against CLAUDE.md word limits.
- Style sweep: no em-dashes, no PI/lead PI, founder order Erik / Luca / Vaughn, no v1 terms (KRAS, MRTX1133, pancreatic, Boltz, RFdiffusion, DiffDock), no 'wrote this proposal with WorkGraph' recursion claim, CRISPRme/Casgevy precise, DNA-Diffusion not in funded scope.
- Confirm budget sums to $1,500,000.
- Confirm Liverpool ack (§28 with H3 architectural divergence sentence).
- Confirm §30 'reviewers want science deliverable' risk preserved.
- Do NOT overwrite v2 or v3.
Output
workgraph_google_application_FINAL_v3_1.mdat project root.~/poietic.life/notes/v3-1-fanout-assembly-summary-20260501.md(under 800w):- Table mapping each criticism (M1, M2, H1-H7, W1, divergent, O1-O5) to the section(s) edited and the result
- Section-by-section final word counts
- Any conflicts between fix specs and how they were resolved
- Any TODOs left for Erik (M4 GitHub admin, §42/§47 form verification, etc.)
- One paragraph 'how to choose v2 vs v3 vs v3.1' for Erik
wg log a one-paragraph summary.
Constraints
- HARD: every word cap respected. Recount.
- HARD: do NOT overwrite v2 or v3.
- HARD: every fix spec listed above is applied (or the summary explains why one was deferred).
- HARD: style sweep complete.
- SOFT: when fix specs conflict, prefer the larger structural fix (fix-w1) and apply smaller fixes on top.
Validation
- All 12 fix specs read
- Each criticism mapped to a v3.1 edit (or explicit defer reason)
- Every word cap respected (recount)
- Budget sums to $1.5M
- v2 and v3 untouched
- No em-dashes, no PI, no v1, no recursion, no DNA-Diffusion-in-scope
- CRISPRme/Casgevy framing precise
-
workgraph_google_application_FINAL_v3_1.mdat project root -
Summary at
~/poietic.life/notes/v3-1-fanout-assembly-summary-YYYYMMDD.md - Committed on worktree branch (not pushed)
Depends on
Required by
Log
- 2026-05-01T23:26:58.853925895+00:00 Task paused
- 2026-05-01T23:34:02.619028745+00:00 ERIK FRAMING (must land in v3.1): The application should FEEL like 'they build this tool because they want to USE it.' These are people with track records running scientific organizations and resource projects (Erik = vg/PGGB/HPRC; Vaughn = hybrid-teams-under-uncertainty research, FLF, Ethereum Foundation; Luca = CRISPResso/CRISPRme/Chorus/IGVF). The trick is they will be doing a lot of things that ACTUALLY USE WorkGraph — dogfooding. That's what makes it powerful. The application must NOT feel like 'we will build a tool and hope people adopt it.' It must feel like 'we will use it constantly across our active research, that's why it will be useful, and our track records prove we know what useful infrastructure looks like.' When applying fix specs, prefer phrasing that lands this voice. The final coherency review (v3-1-final-coherency) will explicitly check whether this framing landed.
- 2026-05-01T23:57:45.511387077+00:00 Task resumed
- 2026-05-02T00:10:46.055890953+00:00 Spawned by coordinator --executor claude --model opus
- 2026-05-02T00:11:08.563111637+00:00 Starting v3.1 assembly: reading v3 source + all 12 fix specs
- 2026-05-02T00:24:42.939503123+00:00 Validated: word caps OK (every section under cap; §17b 75/75, §45 100/100 at exact cap), budget sums to $1.5M, Liverpool §28 ack present with H3 divergence sentence, §30 'reviewers want science deliverable' risk preserved, 0 em-dashes, 0 PI language, 0 v1 terms, 0 recursion claims, DNA-Diffusion only in §30 as outside funded scope, CRISPRme/Casgevy framing precise, founder order Erik/Luca/Vaughn, v2 and v3 untouched.
- 2026-05-02T00:24:42.975268004+00:00 Assembled v3.1 from v3 (commit 70c8e7f) plus 12 fix specs (M1, M2, H1-H7, W1, divergent-29 Version A, O1-O5). Conflicts resolved: §17c (W1+O1 → drop 'Garrison et al.,' to fit cap), §17d (W1+O3 → compress O3 BioBench definition), §28 (H3+O5 commute, H7 no §28 change). Output at google_ai_competition/.wg-worktrees/agent-201/workgraph_google_application_FINAL_v3_1.md (committed adc06f0 on wg/agent-201/v3-1-fanout-assemble, not pushed); summary at poietic.life/notes/v3-1-fanout-assembly-summary-20260501.md (committed 5db49f5 to poietic.life main). TODOs left for Erik: H7/M4 repo archival, §42/§47 form verification, effort allocations, extended-outline high-risk-arc paragraph.
- 2026-05-02T00:25:03.651623097+00:00 Task pending eval (agent reported done; awaiting `.evaluate-*` to score)
- 2026-05-02T00:27:53.539501300+00:00 PendingEval → Done (evaluator passed; downstream unblocks)