Metadata
| Status | done |
|---|---|
| Assigned | agent-21 |
| Agent identity | 8da3b6fc81685ca44a4e15eb35307ab90ce3f0500e9c08b8b0caae848f7d4ce9 |
| Model | claude:opus |
| Created | 2026-04-28T01:46:48.054092824+00:00 |
| Started | 2026-04-28T02:04:50.239394881+00:00 |
| Completed | 2026-04-28T02:10:36.032554920+00:00 |
| Tags | eval-scheduled |
| Eval score | 0.88 |
| └ blocking impact | 0.90 |
| └ completeness | 0.93 |
| └ coordination overhead | 0.88 |
| └ correctness | 0.90 |
| └ downstream usability | 0.85 |
| └ efficiency | 0.80 |
| └ intent fidelity | 0.92 |
| └ style adherence | 0.95 |
Description
Description
Synthesize the upstream review outputs into a single coherent direction document the user can roll with. The driving question: given what we actually have, given the honest critique, given the visual material available, and given the theoretical reframing in PR #1, is the current direction right?
Inputs (must read all)
STOCKTAKE.md(from stocktake task)REVIEW_LANDING.md(from content review task)VISUAL_LANGUAGE.md(from visual study task)PR1_REVIEW.md(from PR1 engagement task)- v2 application + outline
- STATE.md and CLAUDE.md
Output
DIRECTION.md at repo root with these sections in order:
- What we actually are — paragraph anchored in real artifacts (cite STOCKTAKE.md), not aspirational claims.
- Honest assessment of v2 — does the application reflect what we are? Where does it overreach? Where does it undersell?
- Verdict on poietic.life — keep / redirect / rewrite. Specific.
- Verdict on PR #1 — fold / parallel / defer.
- The 4-day plan — concrete sequence of work between now (2026-04-27) and 2026-05-01 deadline. Dated steps.
- The 12-week plan — coherent post-submission narrative for the demo, the scaffold, the post-submission preprint.
- Risks to the direction — what could break it.
Constraints
- Strong opinion. The user wants something to roll with, not fence-sitting.
- Every claim cites the upstream review documents.
- No em dashes (CLAUDE.md style rule).
- 36-month horizon is out of scope; focus is 4 days + 12 weeks.
Validation
- DIRECTION.md exists at repo root
- All seven sections present
- Each verdict is unambiguous (no "we could either")
- 4-day plan has dated steps
- Cites upstream review documents by name
- No em dashes anywhere
Depends on
Required by
Log
- 2026-04-28T01:46:48.053952684+00:00 Task paused
- 2026-04-28T01:51:58.823430945+00:00 Task published
- 2026-04-28T01:52:32.552956553+00:00 Lightweight assignment: agent=Default Evaluator (31847164), exec_mode=full, context_scope=graph, reason=Task is fundamentally evaluative—forming verdicts on current state (v2 application, landing page, PR#1 relevance) and synthesizing multiple review documents into strategic direction. Evaluator role best matches strong-opinion assessment and judgment formation.
- 2026-04-28T02:04:50.239397637+00:00 Spawned by coordinator --executor claude --model opus
- 2026-04-28T02:04:58.889013734+00:00 Starting direction synthesis. Reading inputs: STOCKTAKE.md, REVIEW_LANDING.md, VISUAL_LANGUAGE.md, PR1_REVIEW.md, v2 app, outline, STATE.md.
- 2026-04-28T02:05:55.300702004+00:00 All four upstream documents read. Writing DIRECTION.md as a single coherent direction the user can roll with: rewrite landing page, defer PR1, fix three gaps in v2 (cohort, PBC age, budget specificity), submit on May 1.
- 2026-04-28T02:10:12.334251337+00:00 DIRECTION.md complete. 7 sections, 39 citations to upstream docs, 4-day dated plan, 12-week plan with 6 fortnight blocks, 9 risks ranked. Verified no em or en dashes (Python unicode scan). All four verdicts unambiguous: rewrite landing page, defer PR1, fix three v2 gaps, submit May 1.
- 2026-04-28T02:10:26.004946515+00:00 Committed: 8bb7a1f — pushed to remote (new branch wg/agent-21/direction-synthesis-virtual)
- 2026-04-28T02:10:33.428523914+00:00 Validated: DIRECTION.md exists at repo root; all 7 required sections present (What we are / Honest assessment of v2 / Verdict on poietic.life / Verdict on PR #1 / 4-day plan / 12-week plan / Risks); each verdict is unambiguous (REWRITE for landing page, DEFER for PR1, SUBMIT v2 with three narrow corrections); 4-day plan has dated steps (Day 0 Sunday 2026-04-27 through Day 4 Thursday 2026-05-01); cites STOCKTAKE.md, REVIEW_LANDING.md, VISUAL_LANGUAGE.md, PR1_REVIEW.md throughout (39 citation occurrences total); zero em dashes or en dashes (Python unicode scan + grep verified).
- 2026-04-28T02:10:36.032559208+00:00 Task pending eval (agent reported done; awaiting `.evaluate-*` to score)
- 2026-04-28T02:13:04.199977523+00:00 PendingEval → Done (evaluator passed; downstream unblocks)