Metadata
| Status | done |
|---|---|
| Assigned | agent-703 |
| Agent identity | f51439356729d112a6c404803d88015d5b44832c6c584c62b96732b63c2b0c7e |
| Created | 2026-05-05T05:14:43.157491778+00:00 |
| Started | 2026-05-05T05:42:41.351754873+00:00 |
| Completed | 2026-05-05T05:50:29.204392448+00:00 |
| Tags | paper-prep,validation, eval-scheduled |
| Eval score | 0.82 |
| └ blocking impact | 0.90 |
| └ completeness | 0.90 |
| └ constraint fidelity | 0.85 |
| └ coordination overhead | 0.76 |
| └ correctness | 0.85 |
| └ downstream usability | 0.86 |
| └ efficiency | 0.76 |
| └ intent fidelity | 0.83 |
| └ style adherence | 0.72 |
Description
Description
Final acceptance walk-through. Implement directly — do not decompose further.
Validation
-
Each of the 12 anchoring findings in
SURVEY_10_11_12_limits_summary_lit.md §1.2is supported by a Main / ED panel — table of which figure -
27 novel contributions ledger:
paper_prep/synthesis/NOVEL_CONTRIBUTIONS.tsv(5 columns: id / claim / metric / figure / TSV), one row per N1..N27 fromSURVEY_10/11/12 §4.2 -
Limitations × findings cross-reference:
paper_prep/synthesis/LIMITATIONS_X_FINDINGS.tsvperSURVEY_10/11/12 §6 T-5 -
Output:
paper_prep/synthesis/ACCEPTANCE_CHECKLIST.mdwith all rows ✓ or with a flag pointing to a WORK_DECOMPOSITION.md ## Gaps entry
Inputs
paper_prep/synthesis/MANUSCRIPT_SKELETON.md,WORK_DECOMPOSITION.mdpaper_prep/surveys/SURVEY_10_11_12_limits_summary_lit.md
Depends on
Required by
Log
- 2026-05-05T05:31:15.059369883+00:00 Lightweight assignment: agent=Careful Programmer (f5143935), exec_mode=full, context_scope=task, reason=Careful Programmer excels at correctness-critical work requiring cross-file validation and structured output creation; high task count (83) and careful tradeoff match the final acceptance checklist requirements.
- 2026-05-05T05:42:41.351758400+00:00 Spawned by coordinator --executor claude --model opus
- 2026-05-05T05:42:54.616731239+00:00 Starting acceptance checklist validation. No prior WIP. Will inspect inputs first.
- 2026-05-05T05:44:16.780357671+00:00 Inputs reviewed: SURVEY_10/11/12 (12 findings, 27 N#, 18 limitations), MANUSCRIPT_SKELETON (4 main + 8 ED + 4 tables), WORK_DECOMPOSITION (figure tasks + gaps). Now generating 3 deliverables.
- 2026-05-05T05:49:53.418087375+00:00 Validated all 4 acceptance rows: A. 12/12 findings mapped to Main/ED panels (Section A table). B. NOVEL_CONTRIBUTIONS.tsv 27 rows × 5 cols (N1..N27 sequential). C. LIMITATIONS_X_FINDINGS.tsv 12 rows × 6 cols, all L1..L18 + preface accounted for. D. ACCEPTANCE_CHECKLIST.md with 7 documented gap-pointer flags into WORK_DECOMPOSITION.md gaps 11–18.
- 2026-05-05T05:50:24.685710737+00:00 Committed: d3ca075 — pushed to origin/wg/agent-703/validate-acceptance-checklist
- 2026-05-05T05:50:29.204398670+00:00 Task pending eval (agent reported done; awaiting `.evaluate-*` to score)
- 2026-05-05T05:58:14.706802688+00:00 PendingEval → Done (evaluator passed; downstream unblocks)